Title from CALPOST:
APCD BART - Rocky Mtn NP (ROM); 9/09/05 emissions scenario: v1_mnitrate44ppb    
MVISBK=6; EPA2003 centroid monthly f(RH); EPA2003 20%bestdays natural backgrd   
2002 36km MM5, 4km CALMET, hourly ozone; BART-eligible source= CEMEX            

Days processed:  364
Receptors processed:      407
CALPOST species: ALL
Contribution threshold: 0.5

Summary of delta-deciview results:

The 'High  1st High' from the model is:   2.292 dv
    Number of days 'High 1 High' delta-deciview => 0.5:  46
    Number of days 'High 1 High' delta-deciview => 1.00:  11


98th Percentile Results:
-------------------------------------------------------------
Method 1. DAY-SPECIFIC - closest modeled value:
    The ' 8 High' value from the model is:  1.268 dv
       at receptor     485 on day  137(2002)

Method 2a. RECEPTOR-SPECIFIC - closest modeled value:
    The 'High  8 High' value from the model is:  1.020 dv
       at receptor     461 on day  138(2002)
    Number of days with delta-deciview => 0.5:  44
    Number of days with delta-deciview => 1.00:   2

Method 2b. RECEPTOR-SPECIFIC - Weighted Average at X[(n+1)p]:
    The calculated 98th percentile value
    using a weighted averaging method is:    1.095 dv
       at receptor     485
       using days  138(2002) and 305(2002)
-------------------------------------------------------------
